| Project |
Location |
Summary |
| Tri-Cities
Regional Airport |
Blountville,
TN |
Replaced existing Andover system for 9
existing units, and added 2 new chillers, 1 boiler, and 3 Air
handlers.
|
| National
Story Telling Center |
Jonesborough,
TN |
Water source heat pumps in new
structure.
|
| Floyd County
Schools |
Floyd County VA |
Integrated new additions into existing
buildings systems. Exhaust fans, heat pumps, make-up air units.
|
| Edgemont
Presbyterian Church |
Bristol, TN |
HVAC controls in existing structure.
|
| Unimin Mining
Corp. |
Spruce Pine, NC |
Analytical lab- Positive and negative
pressures. DX and gas-fired temperature controls on 100% outdoor
air unit. Re-heats on rooms
|
| Quality
Assured Labels |
Weaverville, NC |
Temperature control of package units in
existing industrial building.
|
| First
Presbyterian Church |
Johnson City, TN |
Multi-staged retro-fit of historic
structure. Water-source room heat pumps, loop control, existing
boiler and new cooling tower.
|
| FIT Fiber
Technologies |
Johnson City, TN |
Temperature control of package units in
existing industrial building.
|
| St. Mary's
Church |
Johnson City, TN |
New structure with multiple zones and
air handlers.
|
| Buncomb
County Testing Lab |
Asheville, NC |
New
bio-hazard testing facility.
Pressure controls, temperature controls and System alarming
|
| Pisgah National
Forrest Dormitory |
Transylvania County, NC |
New structure with
closed loop water source heat pumps, energy recovery units, and variable-volume
exhaust system.
|
| Mitchell
County Courthouse |
Bakersville, NC |
New structure with
closed loop water source heat pumps and variable-volume air
terminals.
|
| Belinda Mason
Science Building |
Whitesburg, KY |
New structure with water source heat pumps cooling tower and
boiler. Using LON SNVTs allows customers Johnson Controls
front-end to access and control the system.
|
| Mountain
Comprehensive Hospital |
Whitesburg, KY |
New VAV system with hot water reheat coils. Retrofit of obsolete
Barber Coleman control system to new Inet controllers in
existing building.
|